 L.E. Chiller Upgrade  

Portland Int'l Expansion L.E. Chiller Upgrade 1201 Lloyd Building Marketing/Advertisements 

 

Project Highlights


BEFORE

The owner requested from us a impact study to see if the cooling tower would fit and not be an eyesore.

PROPOSED

Our graphics department made the photo-realistic sketch from the original photo and added cooling tower elements from the manufacturer’s website.

DONE

Here is shown the completed project. Very similar to the proposed sketch.

CHILLER INSTALL

Placed chiller is well coordinated with the existing equipment.

RPG (Rapid Projects Group) required a photo realistic representation of a proposed chiller installation for a major medical facility.  The owner needed to know if the installation of a new 100 ton cooling tower was going to end up being a ungainly eyesore to his visitors.  Our CAD design team went to work to show the potential impact and provide the owner with the reassurance that his facility expansion project would blend in with the existing conditions.